Facility Management
Post-construction Cleaning
Builders' clean and final handover clean that brings a completed site to occupancy standard.
01Who this is for
Suited to.
- Contractors
- Developers
- Project managers
- Incoming occupiers
02Scope
What is included.
- Debris and construction-waste removal
- Dust extraction from surfaces and services
- Cement, paint and adhesive residue removal
- Glass, frame and track cleaning
- Floor preparation and finishing
- Final handover detailing
03Method
How the work is run.
- 01
Stage 1
Rough clean and bulk debris clearance during late works.
- 02
Stage 2
Detailed dust removal and residue treatment after trades leave.
- 03
Stage 3
Final handover clean immediately before inspection.
04Safety & compliance
Controls applied.
- Site induction and PPE compliance
- Coordination with remaining trades
- Controlled dust and waste handling
05Environments
Where we work.
- New builds
- Fit-outs
- Refurbishments
- Infrastructure buildings
06Questions
Frequently asked.
- How is a quotation prepared?
- Scope is confirmed through a site assessment or a detailed brief, then priced against area, frequency, access requirements and consumables.
- Can work be scheduled outside operating hours?
- Yes. Programmes are commonly scheduled overnight, at weekends or in phased zones to avoid disrupting occupied premises.
- Who supervises the work?
- Each programme is assigned a supervisor responsible for method, checklists, quality verification and client reporting.
Facility Management
Arrange a site assessment
Share the site, area and frequency required and we will prepare a scoped proposal.