Skip to content
Stratus HorizonLimited

Facility Management

Post-construction Cleaning

Builders' clean and final handover clean that brings a completed site to occupancy standard.

01Who this is for

Suited to.

  • Contractors
  • Developers
  • Project managers
  • Incoming occupiers
02Scope

What is included.

  • Debris and construction-waste removal
  • Dust extraction from surfaces and services
  • Cement, paint and adhesive residue removal
  • Glass, frame and track cleaning
  • Floor preparation and finishing
  • Final handover detailing
03Method

How the work is run.

  1. 01

    Stage 1

    Rough clean and bulk debris clearance during late works.

  2. 02

    Stage 2

    Detailed dust removal and residue treatment after trades leave.

  3. 03

    Stage 3

    Final handover clean immediately before inspection.

04Safety & compliance

Controls applied.

  • Site induction and PPE compliance
  • Coordination with remaining trades
  • Controlled dust and waste handling
05Environments

Where we work.

  • New builds
  • Fit-outs
  • Refurbishments
  • Infrastructure buildings
06Questions

Frequently asked.

How is a quotation prepared?
Scope is confirmed through a site assessment or a detailed brief, then priced against area, frequency, access requirements and consumables.
Can work be scheduled outside operating hours?
Yes. Programmes are commonly scheduled overnight, at weekends or in phased zones to avoid disrupting occupied premises.
Who supervises the work?
Each programme is assigned a supervisor responsible for method, checklists, quality verification and client reporting.

Facility Management

Arrange a site assessment

Share the site, area and frequency required and we will prepare a scoped proposal.